Aller au contenu
Contact us Contact

Interior fit-out and finishes

Your premises speak before you do.
So they had better say the right thing.

A candidate, a client, a partner crosses your entrance hall before the meeting begins.
Materials, lighting, the state of the finishes: what shows there is settled at the drawing stage, like the rest of the building.

Bright office floor after refurbishment, suspended zone panels and treated glazed partitions

What we do

Four surfaces every office already has.

Reception desk clad in oak panels with a brushed brass band, indirect lighting

Entrance halls and reception areas

The first place a visitor sees, and the only one they will remember in any detail. Reception desk cladding, feature wall, backlit built-up logo, decorative acoustic treatment.

  • Built-up logos and backlit letters
  • Reception desk cladding
  • Large-format feature walls
  • Decorative acoustic panels
Frosted film being applied to a glazed partition, felt squeegee driving out the bubbles

Window graphics and technical films

Glazing is the largest surface a workplace has going spare, and the least used. Privacy, safety, visual identity, and sometimes all three on the same pane.

  • Frosted and sandblasted-effect films
  • Micro-perforated one-way vision film
  • Blackout and solar control films
  • Glass manifestation to regulations
Large-format printed wall graphic in a corridor, geometric pattern in neutral tones

Wall graphics

Large-format printing, bespoke wallpapers, applied panels. From a mural running the length of a wall to a simple nod to the brand guidelines in a meeting room.

  • Bespoke printing
  • Applied panels and frames
  • Paint and stencils
  • Partition cladding
Floor graphics for circulation, red pedestrian walkway and white pictograms in an industrial hall

Floor graphics

Circulation, safety, spacing, logistics zones. The floor is a signage surface in its own right, and the only one people look at while walking.

  • Anti-slip floor vinyls
  • Industrial and logistics marking
  • Marked routes and tactile guidance
  • Bay and zone numbering

When we are called in

Four moments, and the time to allow for each.

These timings cover the whole route, from the first site survey to handover, consents included where the project calls for them.
They assume a decision already taken, not a project still being weighed up.

3 to 4 months

Moving in

New premises to fit out from end to end, with an occupation date that does not move.

2 to 3 months

Rebranding

New brand guidelines to roll out across every site, consistently and often in a single operation.

2 to 4 months

Merger or acquisition

Two identities to reconcile, teams to relocate, and a timetable set by the legal department.

6 to 10 weeks

Switch to hot-desking

Wayfinding reorganised from top to bottom: zones, lockers, bookable rooms, a new logic of circulation.

Built-up metal shapes mounted on standoffs, warm halo of light on the pale wall

A common constraint

Your teams keep working while we install.

Most of our projects take place in premises that are still in use. That means installing outside office hours, in the evening, overnight or at the weekend, protecting workstations, keeping noise and dust under control, and handing each area back usable the next morning.

It also means a health and safety plan drawn up properly, coordination with your own safety team, and teams accredited to work at height and on electrical installations.

It is a constraint we build into the quotation from the start, not a last-minute discovery that pushes the programme back.

Show us your spaces.

One visit is enough to know what is possible, what is not, and what it comes to.
You leave with an order of cost, not with a brochure.