You have a date.
We take care of the rest.

From the site survey to installation: technical design, graphics, consents, structural calculations, health and safety plan, manufacture and site work. One point of contact, one responsibility.

Built-up brass letters mounted on standoffs, the cast shadow lifting each character off the wall

Three trades, one standard

What you see depends entirely on what you do not.

Brushed stainless steel wayfinding totem in the lobby of a head office, engraved lettering and directional arrows

01

Signage

Nobody compliments good signage.
That is exactly what makes it good.

Circulation studies, layout drawings, totems, door signs, safety signage and accessible signage. From the first site survey through to installation.

  • Circulation studies and planning
  • Wayfinding signage
  • Accessibility in public buildings
  • ISO 7010 safety signage
Signage
Flexible office floor, suspended zone signage and frosted privacy bands on the glass partitions

02

Interior fit-out

Your premises speak before you do.
Best make sure they say the right thing.

Interior finishes, window graphics, wall graphics, floor graphics and the staging of lobbies and reception areas.

  • Lobbies and reception areas
  • Window graphics and technical films
  • Wall graphics and decoration
  • Floor graphics
Interior fit-out
Exhibition stand with a modular aluminium frame and tensioned fabric panels, integrated lighting

03

Exhibition stands

Here, the date is not negotiable.
The doors open on time, and everything has to be standing.

Modular stands, reusable from one show to the next. Design, manufacture, build-up on site and storage between events.

  • Design and manufacture
  • Build-up and dismantling
  • Storage between shows
  • Reusable structures
Exhibition stands

The method

Seven steps between your decision and your date.

The fifth one governs all the others.
In France, consent for a sign takes two months to obtain, and that time is never made up.
We set it in motion as soon as the visuals are approved, alongside manufacture, so that it never weighs on your date.

  1. 01

    Site survey

    Measurements on site, photographs, a look at the existing substrates and at the access constraints.

    D+3
  2. 02

    Technical design

    Circulation planning, layout drawing, choice of substrates and materials.

    W1 to W2
  3. 03

    Graphic design

    Your brand guidelines applied, visuals shown in place, simulations before you decide.

    W2 to W3
  4. 04

    Detailed quotation

    A quotation costed line by line. No opaque lump sum.

    W3
  5. 05

    Consents and approvals

    Consent applications, sign approvals, structural calculations, health and safety plan.

    W3 to W11
  6. 06

    Manufacture

    Production at our partner workshops, quality control before dispatch.

    W8 to W11
  7. 07

    Installation

    Site coordination, installation by accredited teams, handover with you.

    W12
  8. The seven steps in detail

    Real lead times, the documents to provide, and what can be run in parallel.

The part nobody sees

A fine sign put up without consent is still a sign that has to come down.

The visible part of the trade fits into a few weeks of manufacture.
The rest is administrative, regulatory and technical.
That is where projects come apart, and it is exactly the part we take on in full.

Consent

Prior consent for signs

A fascia sign is almost never put up without prior consent. In France, the application takes two months to process, and that period cannot be shortened.

Local rules

Local authority rules

Every local authority sets its own rules on size, height and illumination. What is accepted in one street can be refused in the next.

Public access

Accessibility

Mounting height, contrast, character size, tactile lettering and braille in buildings to which the public has access.

ISO 7010

Safety signage

Standardised pictograms, escape routes, first aid. Safety signage that does not meet the standard leaves the liability with you.

Structure

Structural calculations

For any sign at height or on a facade: wind loading, fixings and the load the substrate will take.

Site safety

Health and safety plan

Required whenever an outside company works on your premises. We draw it up and coordinate it.

The company

The reach of a group.
The decisions of a small team.

For more than twenty years we have been equipping head offices, healthcare buildings, public buildings and industrial sites. These are projects where the difficulty is not the drawing but the coordination: a sign schedule to hold item by item, weeks of installation on sites that carry on working, and a consent file running in parallel.

Our partner workshops cover the full range of techniques: built-up letters, backlit or not, light boxes, UV printing, powder coating, engraving, one-way vision film, aluminium, brass and acrylic. Our installation teams work anywhere in France, at night and on occupied sites when that is what it takes.

What differs is the format. One contact who decides, not an account manager who passes it on. A quotation within three days of the survey. And the whole administrative side handled by us: consents, structural calculations and health and safety plans.

About the company

What is your date?

A move, an opening, a trade show, a change of identity.
Tell us when, and we will tell you what to set in motion, and when.
The site survey takes forty-five minutes and commits you to nothing.